CLAIM-2026-08-05-02
Article 14(1)-(2) requires a manufacturer that becomes aware of an actively exploited vulnerability in its product with digital elements to notify the CSIRT designated as coordinator and ENISA simultaneously through the single reporting platform: an early warning within 24 hours indicating the Member States affected, a vulnerability notification within 72 hours with general information and any corrective measures, and a final report no later than 14 days after a corrective or mitigating measure is available.
Why it matters
Twenty-four hours is not enough time to go looking. It only works if 'which of our shipped releases contains this component' is already a query, which makes SBOM coverage — including code and dependencies chosen by an agent — an operational control rather than a compliance artefact.
Sources
- europeancyb2024cyber
- europeancom2026cyber